Rental of 4 MW and 12 MW GTGU for North Business Unit
Period
Scope
The Power plant consists of gas turbine generator sets, 13.8kV
and 480V electrical
system housed inside 2 Portable Control Rooms
CNOOC SES Ltd is currently running these machines in the block
All of the above Solar Turbines are running on associated gas with
29% CO2 content.